Closed
The Addendum No.2 for Bids for Design, Supply, Installation, Testing, Commissioning, Operation and Maintenance of 100MW/200MWh Battery Energy Storage System Project.
Shown in the language the agency published it in. No English translation is available.
- Agency
- Électricité du Cambodge
- Market
- Cambodia
- Published
- 27 Apr 2025
- Closes
- 5 May 2025, 17:00 add to calendar
Source
Collected from edc_kh. Documents, clarifications and the authoritative wording stay on the issuing portal — this page never hosts them.
Open the original noticeLast changed 1 day ago. When this source last ran.