Awarded
Roads
Design, Supply, Delivery, Installation, Testing And Commissioning Of Ten Units Of Digital Projectors For The 360 Degree Full Mission Bridge Simulator At The Integrated Simulation Centre Singapore (ISC) With 1-Year Warranty And 5-Year Comprehensive Maintenance Contract
Shown in the language the agency published it in. No English translation is available.
- Agency
- Maritime and Port Authority of Singapore
- Market
- Singapore
- Reference
- MPA000ETT23000014
- Published
- 3 Oct 2023
Award
PANASONIC FACTORY SOLUTIONS ASIA PACIFIC PTE. LTD.
SGD 376,300.00
Source
Collected from gebiz_history. Documents, clarifications and the authoritative wording stay on the issuing portal — this page never hosts them.
Open the original noticeLast changed 5 days ago. When this source last ran.