Awarded
Power
Detailed Feasibility Study for Installation of Solar-PV Hybrid Power Plant in Manado Tua & Nian Islands, North Sulawesi Province
Shown in the language the agency published it in. No English translation is available.
- Agency
- UNDP Country Office - INDONESIA
- Market
- Indonesia
- Reference
- PS/2019/00000818
- Published
- 10 Jan 2020
Award
Balai Besar Teknologi Konversi Energi
USD 37,176.00
Description
Detailed Feasibility Study for Installation of Solar-PV Hybrid Power Plant in Manado Tua & Nian Islands, North Sulawesi Province
Source
Collected from undp_awards. Documents, clarifications and the authoritative wording stay on the issuing portal — this page never hosts them.
Open the original noticeLast changed 5 days ago. When this source last ran.